Media Summary: In a narrow alley, or where pulling the transverse Deploying a preconnected attack line that is loaded in the This can be used when advancing hose a long distance through many twists and turns, such as up a stairwell.
Triple Layer Load Shouldering It - Detailed Analysis & Overview
In a narrow alley, or where pulling the transverse Deploying a preconnected attack line that is loaded in the This can be used when advancing hose a long distance through many twists and turns, such as up a stairwell. When spaces are tight the 2-person deployment can be a great option to deploy the attack line without having to walk the line out.