Media Summary: Training video for how to reload 200' side-by-side Training video for how to reload a 200' rear preconnect with a 100' minuteman bundle, and a two-loop 100' skid load. The Clark County Fire Department Class of 26-1 graduated on May 21, 2026.

Kfd Crosslays - Detailed Analysis & Overview

Training video for how to reload 200' side-by-side Training video for how to reload a 200' rear preconnect with a 100' minuteman bundle, and a two-loop 100' skid load. The Clark County Fire Department Class of 26-1 graduated on May 21, 2026. Less than 60 seconds, from parking break to water at the nozzle. For anyone that's ever asked or that we've shown, here is how we pull our flat load at 24-C. We have two goals pulling it this way: ... Instructions on loading the trashline on Engine 218 and 123. Audio tracks provided by Jason Guzman Music: ...

Photo Gallery

KFD Crosslays
KFD Engine 1 hose load, part 1
Pulling the Crosslay
KFD Rear Preconnects
KFD Minuteman Deployment
CCFD Fire Academy 26-1 -  Crosslay Cowboys
MVFD Hose Loading - 1 3/4" Crosslays
PAFD Crosslay   Loading
CFD Crosslay Packaging - Speed Loads
Crosslay Deployment
50/50 Attack Line Deployment from Truck
Stretching the double loop flat load
Sponsored
View Detailed Profile
KFD Crosslays

KFD Crosslays

Training video for how to reload 200' side-by-side

KFD Engine 1 hose load, part 1

KFD Engine 1 hose load, part 1

KFD Engine 1 hose load, part 1

Pulling the Crosslay

Pulling the Crosslay

Pulling the Crosslay

KFD Rear Preconnects

KFD Rear Preconnects

Training video for how to reload a 200' rear preconnect with a 100' minuteman bundle, and a two-loop 100' skid load.

KFD Minuteman Deployment

KFD Minuteman Deployment

KFD Minuteman Deployment

Sponsored
CCFD Fire Academy 26-1 -  Crosslay Cowboys

CCFD Fire Academy 26-1 - Crosslay Cowboys

The Clark County Fire Department Class of 26-1 graduated on May 21, 2026.

MVFD Hose Loading - 1 3/4" Crosslays

MVFD Hose Loading - 1 3/4" Crosslays

Instructional Video - How to load.

PAFD Crosslay   Loading

PAFD Crosslay Loading

PAFD

CFD Crosslay Packaging - Speed Loads

CFD Crosslay Packaging - Speed Loads

Basic procedure for loading

Crosslay Deployment

Crosslay Deployment

Less than 60 seconds, from parking break to water at the nozzle.

50/50 Attack Line Deployment from Truck

50/50 Attack Line Deployment from Truck

Description.

Stretching the double loop flat load

Stretching the double loop flat load

For anyone that's ever asked or that we've shown, here is how we pull our flat load at 24-C. We have two goals pulling it this way: ...

Trash Line Load

Trash Line Load

Instructions on loading the trashline on Engine 218 and 123. Audio tracks provided by Jason Guzman Music: ...